About usThe company covers an area of 140000 square meters, has 8 main production workshops, has more than 600 employees, and has more than 300 sets of advanced heat treatment, machining, inspection, measurement, and experimental testing equipment. It is currently a strong comprehensive capability in China. Manufacturing enterprises.
-
Product Introduction
-
-
13
2020
-
11
HYD200 type use and maintenance points (II)
Parts, tools and hands should be kept clean during maintenance, and should be wiped with high-grade toilet paper as much as possible, and silk cloth should be used for cleaning parts.

HYD200 use and maintenance points
(6) Parts, tools and hands should be kept clean during maintenance, and high-grade toilet paper should be used to wipe as much as possible, and silk cloth should be used for cleaning parts.
(7) All the seals involved in small, medium and overhaul shall be replaced to ensure continuous operation time after one maintenance. The loss of a rock drill is several times to a hundred times higher than that of a seal..
(8) Hydraulic rock drill has strict requirements for working fluid. When working for a certain period of time, the working fluid changes, which will reduce or lose the good viscosity-temperature characteristics, and the poor lubrication performance will greatly reduce the abrasion resistance., Causing early damage to parts, but also reduce rust resistance, and strengthen the corrosion. This reduces the service life of the rock drill, resulting in early scrap. Therefore, the working fluid must be replaced regularly according to the regulations, and if emulsification is found within the specified period, it must be replaced immediately.
(9) In order to ensure the service life of the water seal of the water supply system, it is necessary to start the machine after boiling water, and it is not allowed to start the machine without water supply, otherwise it will cause the sealing lip of the water seal to burn and lose the water sealing performance.
Water seal 
(10) It is absolutely not allowed to let the rock drill hit empty before the water supply device and drill tail are installed. The consequence of empty hitting is that the impact cylinder body will be scrapped and minor damage will be sent to the factory for overhaul.

Previous article
Previous article
RELATED INFORMATION
Contact Us
Address: Lianhua Mountain, Yangjiazhangzi Economic and Technological Development Zone, Huludao City, Liaoning Province, China
Telephone:0086-429-4428053 0086-429-4428052
TikTok
WeChat Public Number
Privacy Policy Website construction:China Enterprise Power Jinzhou SEO Tags